Brand Asset Review Gate (QA)
A checklist with 6 steps: Confirm the deliverable matches the approved brief before any visual review begins.
By InnovaAI ResearchPublished
What are the steps?
Brand Asset Review Gate (QA)
- 01
Confirm the deliverable matches the approved brief before any visual review begins
Compare dimensions, copy, channel format, and required brand elements against the signed brief, so reviewers judge against a fixed standard rather than personal taste.
- 02
Check brand token compliance: colors, type scale, logo clear space, and spacing
Pull values from the client's brand system or Figma library and flag any hard-coded hex codes or off-scale font sizes that drifted during production.
- 03
Run an accessibility pass on contrast ratios and text sizing
Verify body text and interactive elements meet WCAG AA contrast thresholds, since subscription designers working from a shared brief often miss contrast on secondary colors.
- 04
Test the asset in each delivery context before sign-off
Render web assets at mobile and desktop breakpoints and export social formats at platform-specific sizes to catch cropping and safe-zone errors.
- 05
Log every defect against a shared issue list with a severity tag
Separate blocking defects from polish notes so the account lead can decide which items go back to the designer and which ship as-is.
- 06
Record the reviewer, date, and approval status in the client file
A dated approval trail protects the agency when a client later disputes which version was signed off for launch.