Operating ProcedureExecution layer

Gateway Cutover Checklist (Onboarding)

A checklist with 7 steps: Inventory every client workflow that calls a model endpoint.

By InnovaAI ResearchPublished

What are the steps?

checklist

Gateway Cutover Checklist (Onboarding)

  1. 01

    Inventory every client workflow that calls a model endpoint

    Record the current base URL, SDK version, model string, monthly token volume, and whether the output lands directly in a client deliverable. Agencies often find two or three forgotten scripts during this pass.

  2. 02

    Pin the model identifier and generation settings before any change

    Write down temperature, max tokens, system prompt version, and tool schemas for each workflow. Without these values, a later quality comparison has no baseline to measure against.

  3. 03

    Stand up a second endpoint in staging alongside the current host

    Pick a gateway with a different hosting footprint, such as endlesstokens for flat-pass capacity or SeedRouter's OpenAI-compatible language route for metered billing. Keep the fallback live so route-critical retainer work has somewhere to fail over.

  4. 04

    Replay identical inputs through both endpoints and log the diffs

    Use a fixed set of 20 to 30 representative client prompts. Where the host advertises byte-identical deterministic output, such as TokenDelivery.ai, hash the responses. Where it does not, score outputs against a short rubric covering accuracy, tone, and format.

  5. 05

    Move the base URL and API key into environment config, not application code

    A single config change should switch the endpoint. Confirm the SDK accepts the custom base URL without patches, then verify that streaming, tool calls, and structured outputs still parse.

  6. 06

    Set spend caps and concurrency limits on the new endpoint

    Flat-pass and per-token plans enforce different ceilings, so check the concurrent session limit per key and the monthly budget alert before traffic moves. Record the ceiling next to the client's approved monthly AI spend.

  7. 07

    Log the cutover in the client handoff record and get written sign-off

    Note the date, endpoints, fallback route, and rollback steps in the client file. Retainer clients should receive a one-paragraph summary they can forward to their own procurement or security reviewer.