Operating ProcedureExecution layer

Rollback Drill and Incident Rehearsal (QA)

A sequence with 7 steps: Pick one live client deployment and schedule a 30-minute rollback window with the client notified in writing.

By InnovaAI ResearchPublished

What are the steps?

sequence

Rollback Drill and Incident Rehearsal (QA)

  1. 01

    Pick one live client deployment and schedule a 30-minute rollback window with the client notified in writing

    Choose a low-traffic slot and a deployment the client already understands. The drill is a rehearsal, not a surprise, so the notice should name the window and the expected zero-downtime outcome.

  2. 02

    Confirm the last known-good artifact is retrievable before touching production

    Verify the previous build or commit hash is still deployable from your pipeline, whether that is a DeployHQ one-click rollback target or a tagged image in a container registry. An unrecoverable rollback point invalidates the whole exercise.

  3. 03

    Record the current production state as a baseline snapshot

    Capture response times, error rates, and the deployed version string so the post-drill comparison has a reference point. Screenshots or a short log export are enough.

  4. 04

    Execute the rollback and time it end to end

    Start the clock at the trigger and stop it when the prior version serves traffic. Anything above five minutes on a static or PHP stack deserves a written explanation in the drill notes.

  5. 05

    Walk the client-facing smoke tests immediately after the rollback completes

    Hit the login, checkout, or form-submission paths the client actually depends on. A rollback that restores the old code but breaks a database migration is a failed drill.

  6. 06

    Redeploy forward to the current version and confirm parity with the baseline

    This second half of the drill is the part most agencies skip. Forward redeploys surface migration and config drift that a rollback alone hides.

  7. 07

    Log the timings, the failure points, and one concrete pipeline change in the client's delivery record

    Attach the drill notes to the retainer file so the next engineer inherits the finding. A drill that produces no pipeline change was theater.